Kitchen renovation in Dubai

New cabinets in the same layout, or a rebuild with the sink moved: describe the kitchen and a partner contractor visits to quote.

Kitchen renovation in Dubai is quoted and built by a partner contractor, who signs the contract with you, while Dubai Renovations takes the enquiry and writes the brief. The work ranges from new cabinets and a worktop in the same layout to moving the sink, hob and appliances.

The scope turns on whether water, drainage, gas and power move, what your building or community approves, and how much room the kitchen has.

Who does the kitchen contracting on a Dubai Renovations job?

A partner contractor visits your home, checks community rules, and provides a written quote. If you accept, they handle approvals and do the work. You sign one contract, which covers payments, programme and any warranty, and deal with one company on site. There is no obligation to proceed, and you can verify the contractor's trade licence on the UAE Government portal.

Should the kitchen keep its layout?

A same-layout kitchen renovation replaces what you see: cabinets, worktop, splashback, sink, taps and lighting. The pipes and power points stay put, so the work is quicker and simpler to approve, and the kitchen is out of use for a shorter stretch.

A new kitchen layout means opening walls and floors to move water, drainage and power, with the approvals that come with it. An island with a sink needs a drain run under the floor.

A wall taken down to open the kitchen to the living room can be structural, which brings drawings and an authority permit, and the open kitchen design guide covers the extraction and island clearances that layout needs.

Kitchen renovation scopes compared
ScopeWhat changesApprovals to expectWhat the partner needs to see
Refit, same layoutCabinets, worktop, splashback, sink, taps and lightingBuilding management's approval in an apartment; community rules in a managed villa communityPhotos, the room measurements and the appliance models
Replacement with new powerNew cabinets plus extra circuits, a new oven or induction hob, a ducted hoodThe same approvals, with the hood's duct route agreed where it crosses shared wallsA photo of the distribution board and the current hob type
Layout changeSink, hob or island moved, with drains and power reroutedCommunity or building NOC, with drawings where drainage or walls moveFloor plan, drain positions and which walls carry load
Opened to the living roomA wall removed to make the kitchen open planCommunity or building approval, plus an authority permit where the wall is structuralStructural information for the wall and the plan for extraction
Illustration of a villa kitchen with a long stone island and oak cabinetry

How much space does the Dubai Building Code ask for in a kitchen?

The Dubai Building Code sets minimum sizes that matter when a kitchen is enclosed, split off or reshaped. An enclosed kitchen needs a net area of at least 5.4 m² and a minimum length and width of 1.8 m. The manoeuvring space between facing counters, or in front of a single-sided run, must be at least 1.2 m, which decides whether an island fits at all.

For villas and townhouses, Part K also says kitchens need windows with a net glazing area of at least 10% of the floor area, though daylight modelling can justify less. Closing in an existing window to gain wall cabinets is a change the partner checks against that rule before designing.

Where can sockets and switches go in a kitchen?

The electrical rules in Part K of the Dubai Building Code follow the British wiring standard BS 7671, and several of them shape a villa kitchen. There must be no sockets within 300 mm of the edge of the sink and no sockets or accessories above a gas or electric hob. Kitchen sockets are mounted 150 mm above the worktop, while general-purpose sockets elsewhere sit 450 mm above the floor.

Switches should not be mounted within 2 m of a tap or sink where the room allows it; in a tight kitchen the code allows insulated, cord-operated ceiling switches instead. Every stationary cooking appliance needs a cooker control switch mounted separately from the appliance, and the code says to avoid control units with a built-in socket, so socket circuits can be grouped behind a 30 mA residual current device.

Does a cooker hood have to vent outside?

Under Part K of the Dubai Building Code, a range hood that discharges outside must use sheet metal ducts of galvanised steel, stainless steel, aluminium or copper, with smooth inner walls, airtight joints and a backdraft damper. A ductless recirculating hood is allowed where it is installed to the manufacturer's instructions and the room has mechanical ventilation from another source.

In an apartment tower, any new duct through an outside wall is a building management question first.

Part K also requires a local exhaust in every villa kitchen, sized to ASHRAE 62.2-2019: 100 cfm (50 L/s) or more for a vented range hood that runs while you cook, and 300 cfm (150 L/s) for other kitchen exhaust fans, downdraft units included, or five air changes an hour in an enclosed kitchen.

Kitchen exhaust discharges on the downwind side of the building, which helps decide the wall the duct goes through.

If your hob runs on gas, moving it is gas work, and your building or community has its own rules for who may touch the supply, so keep the gas connection where it is unless the partner confirms the change is allowed. Cooking outside is a separate job with its own gas and clearance rules, covered on the outdoor kitchens page.

Illustration of a quartz worktop edge with an undermount sink and oak drawers
Illustration of new kitchen base cabinets fitted before the worktop goes on

Water and drainage in a new kitchen

A kitchen sink moved to a new wall or an island needs a gravity drain with enough fall to reach the stack or the external drainage.

Part K of the Dubai Building Code asks for floor drains in every area with wet sanitary fittings or appliances, kitchens included, PVC-U waste pipework to BS EN 1329-1, and rodding eyes at the start of each run and at every change of direction so the pipe can be cleared later.

Unless the villa uses the code's alternative water calculation, the same part caps a kitchen sink tap at 7 litres per minute. A high-flow designer mixer can breach that limit, so ask the partner to check the tap's rated flow before you order it.

Apartment kitchens and villa kitchens

In an apartment, building management decides when work can happen, how materials come up in the lift and where debris goes, and it issues the NOC. Drainage in a tower runs to shared stacks, which limits how far a sink can move, and the unit below sits under your kitchen floor. The apartment renovation in Dubai page covers the NOC and the rest of what a tower stops you changing.

In a villa there is more room to change the layout, but a managed community still has a say: Emaar Community Management requires its approval for alterations in Arabian Ranches and Emirates Living, through Home Modifications on the community portal.

For Palm Jumeirah, Jumeirah Village Circle and Dubai Hills Estate, the villa renovation page lists each community's published route, and the villa renovation cost guide shows how a kitchen fits into a whole-villa budget.

What a written kitchen quote should list

Two kitchen quotes for the same room can differ widely because they price different jobs. A quote you can compare names each of these, or says plainly that it is excluded.

  • Removal of the old kitchen, protection of the floors, and debris disposal
  • Cabinet material, finish, number of units, hinges and drawer systems
  • Which finish goes beside the hob, oven and sink, where heat and steam make wrap and foil finishes peel (the kitchen wrapping guide gives 3M's heat and humidity figures)
  • Worktop material and thickness, with the sink and hob cut-outs
  • Plumbing and drainage work, and any new electrical points
  • Splashback, wall tiling and flooring, if included
  • Appliances: supplied and installed, installed only, or excluded
  • Whether UAE VAT, charged at a standard rate of 5% since 1 January 2018, is included in the total

Questions

Do I need approval for a kitchen renovation in Dubai?

In an apartment, expect building management to ask for a NOC before work starts. In a managed villa community, alterations need community approval. Moving plumbing or structural walls can also need an authority permit. The partner contractor confirms what your job needs and applies for it.

How much space do I need between kitchen counters?

The Dubai Building Code asks for at least 1.2 m of manoeuvring space between facing counters or in front of a single-sided run, and an enclosed kitchen needs at least 5.4 m² of net area.

How powerful does a kitchen extractor hood need to be in Dubai?

For a villa, Part K of the Dubai Building Code sizes kitchen exhaust to ASHRAE 62.2-2019, whose tables put a vented range hood that runs while you cook at no less than 100 cfm (50 L/s). A ductless recirculating hood is allowed where the kitchen has mechanical ventilation from another source.

How much does a kitchen renovation cost in Dubai?

Dubai Renovations does not set prices. The kitchen renovation cost guide explains what drives the price and shows ranges published by a named source, and a partner contractor gives you a written quote after the visit.

Is 20k enough for a kitchen renovation in Dubai?

For a basic refresh with the cabinets kept, it can be. For new cabinets, a worktop and fixtures, 20k sits below the lowest published band that covers them. Bestimate, a Dubai quote-comparison platform, defines a basic refresh as paint, handles, minor lighting and small cosmetic updates, and a standard renovation as new cabinets, countertop and fixtures in the same layout.

The kitchen renovation cost guide shows both rows with their ranges.

How much does it cost to refurb a kitchen in Dubai?

It depends on the scope. Bestimate publishes separate bands for a basic refresh, a standard renovation in the same layout, a premium renovation and a full remodel with layout changes, and they differ widely because the jobs differ.

The kitchen renovation cost guide lists each range beside the work it covers. They are one publisher's planning ranges, not Dubai Renovations prices, and a partner contractor gives a written quote after seeing the kitchen.

What is the most expensive part of a kitchen renovation?

Usually the cabinets, which Bestimate calls one of the largest lines in a kitchen quote. The worktop is the next line to watch, because Bestimate says its price moves quickly with the material, the slab, the thickness and the edge. Moving the sink, hob or an island can add more than either, since it brings drainage, plumbing, electrical and approval work that sits under the finishes.

What is a good budget for a kitchen renovation in Dubai?

One built from the scope. Settle whether the layout stays, find the row in the kitchen renovation cost guide that describes the job, then add what that row leaves out: appliances if the quote excludes them, the building's NOC and any permit, and 5% VAT. Keeping the existing layout is the easiest way to control the cost.

Can I buy my own appliances?

Tell us in the enquiry. The partner can quote installation only, and will need the appliance models early so the cabinets and circuits are built to fit them.

Can I keep my kitchen working during the renovation?

Rarely for long. Once the old units come out, the kitchen is out of use until the new cabinets, worktop and plumbing are in. A same-layout job keeps that gap shorter.

How long does a kitchen renovation take in Dubai?

Bestimate, a Dubai quote-comparison platform, publishes 4 to 6 weeks for new cabinets, a countertop and fixtures in the same layout, and 8 to 14 weeks for a full remodel that moves the plumbing and electrics. A basic refresh takes 1 to 2 weeks, and a premium renovation with custom joinery 6 to 10.

The wait for your building's NOC sits outside all four. The kitchen renovation cost guide sets each band beside the work it covers.

What should you avoid when renovating a kitchen in Dubai?

Wait for building management or the community to approve the work before anything is demolished. Leave the gas point where it is until the partner confirms your building allows a move. Keep the old kitchen in place until the new one is nearly ready, because cabinets and stone worktops are made after the final measure.

And send back any quote that prices the cabinets as a single line, since it hides the carcass, the door finish, the hinges and the runners.